We have the following projects that we wish to receive quotations for. Any interested parties must contact and summit a quotation by 24th March 2022.

 

Project 1

Grinding Room

Install full height partition walls to create a Grinding Room 3,000mm x 3,000mm; install three new partitioning walls.
The partitioning will be constructed to a height of 3,900mm to the underside of the mezzanine floor; this will be formed using steel studs with a layer of 12.5mm plasterboard fitted to each side. Within the void, a 50mm acoustic quilt should be fitted.

Decoration to the walls will be vinyled and trimmed, with matching skirting.
The access to the room will be via a door and a half (hospital style) and will be 838mm wide and 2,400mm high complete with 1500mm x 150mm vision panels, and includes all door furniture and overhead door closers.

 

Project 2

Assembly Rooms

Create three new Assembly Rooms within the existing mezzanine floor, these will be formed using stud partitioning to an area of 18m x 4m.
The above partitioning will be constructed to a height of 2,700mm to the underside of the roof; this will be formed using steel studs with a layer of 12.5mm plasterboard fitted to each side. Within the void, a 50mm acoustic quilt should be fitted.
Each of the three rooms will have a 1,200mm x 1,200mm single glazed window which will be fitted overlooking the warehouse, this will be formed using 6.8mm laminated glass.
Install three walls of dry-lining to the exposed building wall.
Decoration to the walls will be vinyled and trimmed with matching skirting.
Access to the three rooms will be via 838mm wide, solid core, wood veneered doors, complete with powder coated aluminium door frames. These come complete with the stainless-steel door furniture. To each of the three rooms we will install four 600mm deep worktops, complete with support legs.

Electrical

Supply and install the following:
18No 600mm x 600mm LED module light fittings, including 3No emergency battery backups.
Switching to the light will be via PIR sensor.
18No twin 13 amp socket outlets.
Supply and install 6No 12” inline fans complete with controllers
All electrical work will need to be tested to certify to the latest standards.

Building work & staircase

Supply and install a galvanised steel staircase and a top landing on the outside of the building.
Create a concrete base for the staircase.
Form an opening and install a first-floor fire exit from the mezzanine floor.

 

Project 3

Underslung Crane

Manufacture, deliver, install, test, and certify:
New underslung crane to the following specification.
SWL 2 tons
Electric chain hoist
Power trolley-Dual speed all motions
Span 5,000mm approx
Length of travel 18,000mm approx
Pendant control
Note: – crane to be suspended from existing steel structure if appropriate.

We are happy to answer any questions you have about plastic part design and manufacturing.